Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Rajasthan gets New 6-Lane Expressway Between Sri Ganganagar and Jaipur

CalenderPublished at April 25, 2025 by InfraJunction
Rajasthan gets New 6-Lane Expressway Between Sri Ganganagar and Jaipur

Travel Time Will Reduce by 3 Hours, 60 Km Shorter Route

The Government of India, in partnership with the Rajasthan government, has started work on a new six-lane greenfield expressway. This expressway will connect Sri Ganganagar to Jaipur and will make the journey smoother and faster for travellers. Currently, the Detailed Project Report (DPR) work has already started.

Sri Ganganagar to Jaipur Will Now Take Only 5 Hours

At present, it takes about 8 hours to travel from Sri Ganganagar to Jaipur. However, after the construction of this expressway, the travel time will reduce to just 5 hours. The new road will also reduce the total distance between the two cities by 60 kilometres. So, instead of travelling 467 km, the journey will now be just 407 km long.

In addition to saving time, this expressway will also help in the smooth transport of goods. Important local products such as gypsum, edible oils, and agricultural produce from Sri Ganganagar and granite stones from the Jhunjhunu region will reach markets faster.

Major Routes and Areas Covered

This expressway will start from RIICO Industrial Area Bypass in Sri Ganganagar and end at the Mandalana-Narnaul Bypass in Kotputli. It will pass through key towns like Rawatsar, Nohar, Bhadra, Sadulpur, Pilani, Surajgarh, Buhana, and Narnaul. These areas will benefit from better road connectivity and more trade opportunities.

Also, the expressway will connect to major highways like the Amritsar–Jamnagar Economic Corridor and the Delhi–Vadodara Expressway, making travel easier across northern and western India.

Project Cost and Land Acquisition

The total cost of this expressway project will be ₹12,049 crore. To build the expressway, around 2700 hectares of land will be acquired. The DPR work alone will cost ₹30 crore. Once the report is complete, construction work will begin.

This project was announced in the government’s budget and is being taken up as a major step to boost road connectivity in the region. Perhaps, this expressway will not only improve travel but also create new growth opportunities for industries and businesses.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Popular Models By Category





View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
Price Coming Soon
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Rajasthan gets New 6-Lane Expressway Between Sri Ganganagar and Jaipur