Get Loan

NHAI Awards ₹5,730 Crore Guwahati Ring Road Project to Infracon Pvt Ltd

CalenderPublished at April 23, 2025
NHAI Awards ₹5,730 Crore Guwahati Ring Road Project to Infracon Pvt Ltd

A Major Step Towards Decongesting Guwahati and Enhancing Connectivity

The National Highways Authority of India (NHAI) has awarded a ₹5,730 crore contract for the construction of the long-awaited 121-km Guwahati Ring Road. This critical infrastructure project is expected to ease traffic congestion in Guwahati and improve regional connectivity across Assam and the Northeast.

The contract has been awarded to Infracon Pvt Ltd under the DBFOT (Design, Build, Finance, Operate, and Transfer) model, featuring a 30-year concession period that includes four years for construction.

Key Highlights of the Project

  • Project Cost: ₹5,730 crore
  • Developer: Infracon Pvt Ltd
  • Model: DBFOT with a 30-year concession period
  • Construction Timeline: To begin post-2025 monsoon; 4-year construction period
  • Length: 121 km divided into three major phases

Phased Development Plan

The Guwahati Ring Road project will be developed in three segments:

  1. Phase 1: A 55.54-km greenfield corridor from Baihata Chariali to Sonapur
  2. Phase 2: Widening of a 7.76-km stretch of NH-27
  3. Phase 3: Upgradation of 58 km of NH-27, including a 3-km bridge over the Brahmaputra River

This design aims to divert freight and inter-state traffic away from city roads, thereby enhancing vehicular movement and urban mobility within Guwahati.

Strategic Importance and Benefits

The ring road is expected to significantly decongest city traffic, reduce air and noise pollution, and improve the logistics ecosystem across the Northeast.

Alignment with Gati Shakti Vision

This project aligns with the Gati Shakti National Master Plan, focusing on integrated and efficient transport networks. It is also seen as a boost to multimodal connectivity and enhanced access to regional markets.

Statement from Project Officials

An NHAI spokesperson remarked, “The Guwahati Ring Road is not just a road project, but a regional transformation initiative. Once completed, it will open up faster trade routes and facilitate economic growth in Assam and the entire Northeast corridor.”

They further added, “We are committed to completing this project within the stipulated timeframe, ensuring top-tier engineering quality and sustainable development practices.”

Outlook for Assam’s Infrastructure

The awarding of this project marks a significant step in Assam’s infrastructure journey. With reduced congestion and improved road quality, the region is poised for increased industrial activity and better interstate connectivity.

As work begins after the 2025 monsoon season, the Guwahati Ring Road is expected to redefine transportation efficiency and regional development across the Northeast.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

Previous

Next

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

Wishing you a bright & prosperous Diwali from InfraJunction

© 2026 InfraJunction. All Rights Reserved.