Get Loan
percentage_iconCheck Latest Offers

Mumbai’s SCLR Final Stretch to Open by July 2025

CalenderPublished at June 30, 2025
Mumbai’s SCLR Final Stretch to Open by July 2025

Final Stretch of SCLR to Ease Daily Commute

Mumbai is all set to get smoother east-west connectivity as the final phase of the Santacruz-Chembur Link Road (SCLR) is almost complete. The much-awaited 90-degree cable-stayed bridge over the Western Express Highway (WEH) is progressing quickly and is expected to open by July 2025. This new structure will complete the SCLR corridor, helping thousands of commuters avoid congested diversions at Vakola and Hans Bhugra Marg junctions.

Direct Travel from East to West Mumbai

Once opened, the bridge will offer a signal-free route from the Eastern Express Highway (EEH) to WEH, reducing travel time for both public transport and private vehicles. According to the Mumbai Metropolitan Region Development Authority (MMRDA), this final link will be a game-changer for the city’s transport system.

“This 90-degree cable-stayed bridge is the last key piece in the SCLR puzzle. We are aiming to open it for public use by mid-July,” said an MMRDA official.

Why the SCLR Project Matters

The SCLR extension project is one of Mumbai’s most important urban infrastructure developments. It directly connects Kurla to Santacruz, reaching close to the airport near Panbai School. Parts of the SCLR are already in use, but this bridge will complete the full east-west corridor.

With better road conditions, truck movement carrying building materials, equipment, and goods across the city will also become smoother and quicker. This is especially important for construction, logistics, and infrastructure industries that depend on reliable transport routes.

Connectivity

As Mumbai grows rapidly, efficient roads like the SCLR corridor are essential for saving time and reducing traffic stress. The completion of the cable-stayed bridge will not only benefit daily commuters but also improve the movement of trucks and boost infrastructure development in the city.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

Previous

Next

Popular Construction Equipments

HYUNDAI R215L Excavator
HYUNDAI R215L

Engine Power148 Hp

₹ 44 - 46 Lakh
ACE 14XW Crane
ACE 14XW

Lifting Height15.1 Meter

₹ 18 - 20 Lakh
JCB 3DX Plus Backhoe Loader
JCB 3DX Plus

Engine Power55kW (74hp) @ 2200 rpm

₹ 30 - 32 Lakh
JCB 3DX Xtra Backhoe Loader
JCB 3DX Xtra

Engine Power74 Hp

₹ 32 - 34 Lakh
View All ExcavatorsView All Excavatorsicon

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

Wishing you a bright & prosperous Diwali from InfraJunction

© 2026 InfraJunction. All Rights Reserved.