Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Construction Begins on Khair Bypass to Ease Traffic Jams in Aligarh Region

CalenderPublished at June 11, 2025 by InfraJunction
Construction Begins on Khair Bypass to Ease Traffic Jams in Aligarh Region

A Big Step Towards Smoother Connectivity and Economic Growth

After a decade-long wait, the long-awaited construction of the Khair bypass on the Aligarh–Palwal Highway has finally started. The work has commenced on the stretch from Somna Marg to village Zarara. This development, led by the National Highways Authority of India (NHAI), aims to eliminate hours-long traffic congestion in Khair and Jattari towns, enhancing the overall flow of transportation.

Key Highlights of the Bypass Project

  •  Bypass Length: 10 km in Khair and 5.5 km in Jattari
  •  Land Coverage: Land from 29 villages earmarked for construction
  •  Implementing Authority: National Highways Authority of India (NHAI)
  •  Connectivity: Connects to Yamuna Expressway at Tappal Interchange
  •  Project Scope: Approved Detailed Project Report (DPR) now in execution
  •  Technology Use: Advanced technology to ensure faster construction
  •  Purpose: To decongest traffic and support regional infrastructure

Strategic Significance of Aligarh–Palwal Highway

The 67-kilometre-long Aligarh–Palwal Highway, constructed at a cost of ₹552 crore by the Public Works Department (PWD), connects Aligarh to Palwal in Haryana. It intersects the Yamuna Expressway near Tappal, thereby linking Aligarh with Noida, NCR, Mathura, and Agra.

Due to the absence of bypasses at Khair and Jattari, the highway has been facing consistent traffic snarls, leading to public demand for bypass development for years.

Boost to Major Infrastructure Projects

Several key developments are being executed along this corridor, including:

  •  Raja Mahendra Pratap Singh State University
  •  Khereshwar Dham Temple
  •  Transport Nagar
  •  Greater Aligarh
  •  Indian Bottling Plant
  •  Defense Industrial Corridor
  •  Seed Corporation Warehouses

With the Khair-Jattari bypass, these areas will see smoother travel and enhanced accessibility. This is expected to fast-track local business, logistics, and economic development.

Delay Factors Finally Resolved

The primary reason for the delay in the bypass project was the jurisdictional dispute between the PWD and NHAI. While the highway was constructed by the PWD, it was later handed over to NHAI, leading to confusion over project responsibilities.

Recently, NHAI took the lead, prepared the project proposal, and received the DPR approval from the state government. With bureaucratic hurdles cleared, the groundwork is finally underway.

Statements from Key Authorities

Indrajeet Singh, Project Director, NHAI, commented, “The long-awaited Khair bypass construction has commenced. Our priority is to complete it within the stipulated timeline. Modern construction techniques are being used to accelerate progress and maintain quality standards."

Outlook for Regional Growth and Connectivity

The bypass is poised to transform transportation in the Khair–Jattari stretch. By eliminating bottlenecks and easing traffic flow, the project will not only reduce travel time but also boost connectivity to major economic zones. As infrastructure aligns with regional development plans, this bypass marks a critical step towards building a more efficient and accessible Aligarh.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
₹ 30 - 31 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Construction Begins on Khair Bypass to Ease Traffic Jams in Aligarh Region