Get Loan
percentage_iconCheck Latest Offers

Delhi–Mumbai Expressway Nears Launch as Gadkari Signals Final Push

CalenderPublished at December 1, 2025
Delhi–Mumbai Expressway Nears Launch as Gadkari Signals Final Push

8-Lane Corridor Built to Boost Inter-state Connectivity

Union Road Transport and Highways Minister Nitin Gadkari updated that the long-awaited Delhi-Mumbai Expressway is moving closed to completion. While noting that the teams are accelerating work to meet the final deadline, the project will soon open to the public. 

During a review visit to Surat, Mr. Gadkari examined an active construction stretch of the expressway passing through Gujarat. “We are trying to complete the project as soon as possible by removing all obstacles. The road has been built well. We are rectifying all minor deficiencies by employing the best technology,” he said. 

Delhi to Mumbai in Just 12 Hours

Launched in 2019, the Delhi–Mumbai Expressway stands among India’s largest highway initiatives. When complete, the eight-lane high-speed corridor will slash the current 24-hour road travel from Delhi to Mumbai. The construction of the corridor is undergoing stringent quality assessments. He said “world’s best technology” is being used not only to enhance convenience but also to reduce logistics expenses significantly. Greenery will be added along the route to create an environmental buffer.

Plans to Run Electric Buses and Trucks

Gadkari reiterated his vision of seeing electric buses and freight vehicles, stating, “In the future, I have a dream to see electric trucks and buses running on this road. We will incorporate the world’s best technology into the project to reduce logistics costs. I believe this road, once completed, will boost exports as well as tourism, and people’s travel will become more convenient.”

Boost Inter-State Connectivity

According to the minister, upcoming extensions will connect the expressway to Uttar Pradesh and Rajasthan, enabling even faster access between the national capital, western India, and key regional hubs.

Beyond linking Delhi and Mumbai, the expressway will strengthen connectivity across several economic centres in Haryana, Rajasthan, Madhya Pradesh, Gujarat, and Maharashtra, giving a major push to regional development and transport efficiency.

One of India’s Longest Expressway Projects

When complete, the eight-lane high-speed corridor will slash the current 24-hour road travel between the national capital and India’s financial powerhouse by half.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/  
Instagram - https://www.instagram.com/infra_junction/ 
LinkedIn - https://www.linkedin.com/company/infra-junction/

Previous

Next

Popular Construction Equipments

Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power

Engine Power99 HP (73.4 kW) @ 2,200 RPM

₹ 23 - 27.45 Lakh
Tata Hitachi Shinrai Power 4 Backhoe Loader
Tata Hitachi Shinrai Power 4

Engine Power99 HP

Price Coming Soon
Tata Hitachi Shinrai Prime L Backhoe Loader
Tata Hitachi Shinrai Prime L

Engine Power74.3 HP

Price Coming Soon
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime

Engine Power74.3 HP

₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.