Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

New Varanasi-Kolkata Expressway to Reduce Travel Time to Just 6 Hours

CalenderPublished at April 7, 2025 by InfraJunction
New Varanasi-Kolkata Expressway to Reduce Travel Time to Just 6 Hours

Work Begins on the First Phase of the New Expressway

Work on a new expressway between Varanasi and Kolkata has started. The expressway will run through four states: Uttar Pradesh, Bihar, Jharkhand, and West Bengal. The initial phase of the project is already in progress and runs from Varanasi to Chainpur in Bihar's Kaimur district. This is a 27-km stretch, and the land for it has already been acquired.

Expressway to Be Constructed in 13 Phases

The new expressway is being constructed in 13 phases and will cover a total distance of approximately 610 to 690 kilometers. Prime Minister Narendra Modi laid the foundation stone for the project in 2024 under the Bharatmala scheme. Currently, it takes approximately 12 to 14 hours to travel from Varanasi to Kolkata. However, after the construction of the expressway, the traveling time will be reduced by half. Individuals will be able to travel from Varanasi to Kolkata within 6 to 7 hours.

Expressway Will Pass Through 18 Districts

The expressway will pass through 18 districts in total. From Varanasi, it will enter Bihar through Chandauli and then pass through places like Bhabua, Sasaram, Aurangabad, and Gaya. After Bihar, the route goes through Jharkhand covering Chatra, Hazaribagh, Ramgarh, Ranchi, and Bokaro. In West Bengal, it will go through Purulia, Bankura, Bishnupur, Panskura, Haldia, Diamond Harbour, and finally reach Kolkata.

Speed Limit to Be 120 Kmph

One of the main attractions of this expressway is that traffic can move at a speed of 120 kilometers per hour. This implies quicker and smoother journeys for all. Besides, this road will also facilitate trade and tourism between the four states more easily.

Project Details and Costs

This expressway is being constructed in the Greenfield category and will cost around ₹35,000 crore. The biggest segment, approximately 323 km, will be in West Bengal. At the same time, the shortest part, 22 km, will be in Uttar Pradesh. Bihar will have approximately 169 km, and Jharkhand will have 196 km of this expressway.

Boost to Economy and Employment

This expressway will improve travel time and bring many benefits. For instance, it will help boost farming, local industries, and businesses. Thousands of jobs will be created during its construction. Moreover, once it is ready, lakhs of people will get better road connectivity between important cities and towns.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Popular Models By Category





View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

Similar Backhoe Loaders

JCB 2DX Backhoe Loader
JCB 2DX Backhoe Loader
Engine Power
Engine Power
36.4 kW (49 hp)
Bucket capacity
Bucket capacity
0.18 Cum
Digging Depth
Digging Depth
3020 mm
icon
Ex-Showroom price
₹ 18 - 20 Lakh
ACE AX-124 Backhoe Loader
ACE AX-124 Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 23 - 31 Lakh
ACE AX-124 4WD Backhoe Loader
ACE AX-124 4WD Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 27 - 29 Lakh
ACE AX-124 NS Backhoe Loader
ACE AX-124 NS Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 31 - 33 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • New Varanasi-Kolkata Expressway to Reduce Travel Time to Just 6 Hours