Get Loan

UP Govt Clears Rs 25.33 Cr Berhan Bypass in Agra

CalenderPublished at February 5, 2026
UP Govt Clears Rs 25.33 Cr Berhan Bypass in Agra

Long-pending Bypass Project Moves Forward to Ease Traffic

The Uttar Pradesh Government has finally approved the long-delayed Behran bypass project in Agra. This approval includes a 3.95 km bypass, with Rs 8.86 crore released as the first installment. The bypass is expected to benefit over 100 villages by improving connectivity and easing traffic congestion. 

The total project cost is estimated at Rs 25.33 crore. It includes the construction of a 3.95 km, 7-metre-wide bypass designed in line with traffic and safety regulations. It aims to provide relief from congestion currently affecting local roads.

Route Alignment and Key Villages

The proposed bypass will pass through Nagla Taj, Bas Boria, Nagla Gol, and Nagla Dheer. It will link directly with the Jalesar Highway, improving access between surrounding settlements and major routes.

Planned with a width of 7 metres, the bypass will offer an alternative corridor for heavy vehicles. This diversion is expected to reduce congestion within populated areas and support smoother traffic movement.

Safer Travel and Shorter Journeys

Officials expect the new road to improve overall road safety while cutting travel time for daily commuters using this stretch. Beyond easing travel, the bypass is projected to strengthen regional connectivity and support economic activity. Better movement of goods and people is expected to create opportunities for local businesses and industries.

Infrastructure Push by State Government

The approval of the Berhan bypass reflects the state government’s focus on infrastructure development. Authorities have assured the project will be completed within the approved timeframe, with attention to safety standards and construction quality.

Local Leadership Welcomes Decision

BJP MLA Dr Dharmpal Singh welcomed the project, stating it would benefit over 100 villages and significantly improve regional connectivity. He said the bypass reflects the government’s efforts to strengthen infrastructure and improve transport movement.

Previous

Next

Popular Construction Equipments

CASE 851 NX Backhoe Loader
CASE 851 NX

Engine Power74 HP

Price Coming Soon
CASE 952 NX Compactor
CASE 952 NX

Centrifugal Force7700 kN

Price Coming Soon
CASE 450NX Compactor
CASE 450NX

Centrifugal Force1652 kN

Price Coming Soon
CASE 1107 NX Compactor
CASE 1107 NX

Centrifugal Force263 kN

Price Coming Soon
View All Backhoe LoadersView All Backhoe Loadersicon

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.