Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Singaperumal Koil Flyover Opens After 16 Years of Delay

CalenderPublished at February 19, 2025 by InfraJunction
Singaperumal Koil Flyover Opens After 16 Years of Delay

A Long Wait Finally Ends

Chennai: The much-awaited railway flyover at Singaperumal Koil near Chengalpattu is finally opening today (February 19). The construction took 16 years, causing years of struggle for commuters. Now, people are happy as their long wait is finally over.

Daily Traffic Woes

Singaperumal Koil town has over 30 villages, and thousands of people travel through this area daily. The National Highway here is always crowded, leading to long traffic jams. Many vehicles have to wait in line for up to 2 kilometres.

A Major Problem at Railway Crossing

The railway crossing in this area is another major issue. The gates remain closed for hours to allow express trains to pass. This causes even more congestion on the roads, making travel difficult for commuters.

Importance of the Flyover

The Singaperumal Koil-Sriperumbudur Road is one of the busiest roads in the suburbs. Many vehicles, including those heading to Oragadam SIPCOT, use this route. However, with the new flyover, traffic will now move more smoothly.

Hope for Better Travel Experience

People in the area are excited as they believe this flyover will make their daily travel much easier. The Highways Department had earlier announced that the construction would be completed by December 2024, but it is now opening sooner than expected.

In conclusion, after years of delays, the Singaperumal Koil flyover is finally ready. This new road will reduce travel time and traffic jams, bringing relief to thousands of people every day.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Popular Models By Category





View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

Similar Backhoe Loaders

JCB 2DX Backhoe Loader
JCB 2DX Backhoe Loader
Engine Power
Engine Power
36.4 kW (49 hp)
Bucket capacity
Bucket capacity
0.18 Cum
Digging Depth
Digging Depth
3020 mm
icon
Ex-Showroom price
₹ 18 - 20 Lakh
ACE AX-124 Backhoe Loader
ACE AX-124 Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 23 - 31 Lakh
ACE AX-124 4WD Backhoe Loader
ACE AX-124 4WD Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 27 - 29 Lakh
ACE AX-124 NS Backhoe Loader
ACE AX-124 NS Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 31 - 33 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Singaperumal Koil Flyover Opens After 16 Years of Delay