Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Jaipur Gears Up for Major Infrastructure Boost with New Northern Ring Road

CalenderPublished at June 4, 2025 by InfraJunction
Jaipur Gears Up for Major Infrastructure Boost with New Northern Ring Road

110 Km Ring Road Set to Transform Jaipur’s Connectivity

Jaipur, Rajasthan – The Rajasthan government has greenlit a significant infrastructure project, a 110-km-long Northern Ring Road around Jaipur, with an estimated investment of ₹6,500 crore. Union Minister Nitin Gadkari announced this key project at the December 2024 Rising Rajasthan Summit to boost connectivity and economic growth.

Key Details of the Northern Jaipur Ring Road Project

  • Length: 110 kilometers
  • Investment: ₹6,500 crore
  • Implementing Agencies: National Highways Authority of India (NHAI) and Jaipur Development Authority (JDA)
  • Purpose: To enhance connectivity, reduce traffic congestion, and promote regional development. This improved infrastructure is crucial for the smooth movement of goods and people.

Land Acquisition and Farmer Compensation

Minister Gadkari emphasized a fair approach to land acquisition, proposing that 40% of the developed land near the new bypass be allocated back to the original landowners (farmers). This unique model aims to ensure farmers directly benefit from the surge in land value due to infrastructure development.

Official Statement

During the summit, Minister Gadkari highlighted the transformative potential of such projects. "Land prices could increase up to fivefold following the construction of these roads, directly benefiting local communities," he stated. He also underscored the importance of efficient transportation networks for economic growth, especially for sectors relying on goods movement by truck.

Additional Road Projects Announced

Beyond the Northern Ring Road, several other projects totaling ₹30,000 crore in investments were unveiled:

Kotputli to Agra Greenfield Expressway: ₹6,800 crore investment, expected completion by September 2025.

Jaipur-Kishangarh-Jodhpur to Amritsar Highway: ₹12,000 crore investment, with its Detailed Project Report (DPR) currently underway.

Impact on Regional Development

The Northern Ring Road is set to be a catalyst for economic growth in Jaipur and its surrounding areas. Enhanced road infrastructure is anticipated to boost tourism, facilitate trade, and generate numerous employment opportunities, paving the way for a more prosperous Rajasthan.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
₹ 30 - 31 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Jaipur Gears Up for Major Infrastructure Boost with New Northern Ring Road