Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Greater Noida Greenlights Rs 400 Crore Elevated Road to Delhi-Meerut Expressway

CalenderPublished at June 3, 2025 by InfraJunction
Greater Noida Greenlights Rs 400 Crore Elevated Road to Delhi-Meerut Expressway

Infrastructure Boost for Noida Extension to Enhance Connectivity

Greater Noida, India – To reduce traffic and boost connectivity in Noida Extension, Greater Noida Authority has cleared a plan for a 4-km elevated road. This crucial infrastructure project, estimated to cost ₹400 crore, will connect Sector 4 in Greater Noida with the Delhi-Meerut Expressway. Moreover, it provides much-needed relief to thousands of daily commuters.

The proposed elevated corridor will start from the 130 Metre Wide Road in Sector 4. Moreover, it will pass over the densely populated areas of Shahberi and Crossings Republik in Ghaziabad before merging with the Delhi-Meerut Expressway. Officials have confirmed that the National Highways Authority of India (NHAI) will undertake the construction of this important road.

Official Statements

Ravi Kumar NG, Chief Executive Officer of the Greater Noida Authority, emphasized the project's importance, stating "We have given in-principle approval for this 4km elevated road because traffic congestion in Noida Extension is set to rise."

Officials also noted that involving NHAI in the project offers a significant advantage due to their proven expertise in land acquisition. An official from the Greater Noida Authority, aware of the development, highlighted “NHAI can do a better job when it comes to acquire the land for the project in Gautam Budh Nagar and Ghaziabad because it has already done so for the Delhi-Meerut Expressway recently. NHAI will be in a better position to decide the land rates."

Key Project Approved to Ease Traffic

This strategically elevated road is a key part of the Greater Noida Authority's long-term efforts to reduce traffic bottlenecks. Managing truck traffic efficiently is crucial to easing congestion and ensuring smoother connectivity between Greater Noida and Ghaziabad.

 Besides this new elevated road, other long-term solutions include an underpass at Kisan Chowk in Noida Extension Sector 1, expected to be operational in about 1.5 years. Short-term measures involve widening existing arterial and internal roads to ensure smoother traffic flow for residents.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
₹ 30 - 31 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Greater Noida Greenlights Rs 400 Crore Elevated Road to Delhi-Meerut Expressway