Get Loan

NHAI Plans Rs 800 Cr Upgrade to Widen 62 km NH-148 Stretch in Rajasthan

CalenderPublished at November 23, 2026
NHAI Plans Rs 800 Cr Upgrade to Widen 62 km NH-148 Stretch in Rajasthan

Manoharpur-Dausa Highway to Expand from 2 to 4 Lanes

The National Highways Authority of India (NHAI) plans to widen the 62.325-km Manoharpur-Dausa section of NH-148 in Rajasthan. The project will expand the existing two-lane highway to four lanes with paved shoulders. Estimated at Rs 800.66 crore, excluding GST, the upgrade will be developed under the Hybrid Annuity Mode (HAM).

NHAI Invites Bids for Highway Project

NHAI issued its Notice Inviting Bid on November 19, 2026, to select a private developer for the project. The proposed work covers the Manoharpur-Dausa section from design chainage 0+000 to 62+235.

The authority has invited bids under the Hybrid Annuity Mode (HAM). Interested private companies can submit their bids through the government's e-procurement portal.

The key project details are:

  • Highway section: Manoharpur-Dausa stretch of NH-148
  • Project length: 62.325 km
  • Proposed development: Two lanes to four lanes with paved shoulders
  • Estimated cost: Rs 800.66 crore, excluding GST
  • Bid submission deadline: January 6, 2027, at 11 am
  • Technical bid opening: January 7, 2027, at 11:30 am

Four-Lane Expansion to Increase Road Capacity

The proposed expansion will increase the vehicle-handling capacity of the Manoharpur-Dausa corridor. Moving from two lanes to four lanes will provide more road space for traffic.

The project also includes paved shoulders along the main carriageway. These additional paved sections will provide extra road space alongside the main lanes.

Once completed, the upgraded highway could improve travel for daily commuters and other road users. It is also expected to benefit commercial vehicle operators transporting goods along this route.

Project to Follow Hybrid Annuity Framework

The highway upgrade will follow the Design, Build, Operate and Transfer (DBOT) Hybrid Annuity framework.

Under the HAM model, the government contributes part of the construction funding. The selected private developer arranges the remaining investment.

The developer receives payments according to the terms of the concession agreement.

Rajasthan Already Sees Highway Tolling Upgrades

The NH-148 widening proposal is part of several highway improvement initiatives in Rajasthan. In August, NHAI introduced the Multi-Lane Free Flow (MLFF) tolling system at Shahjahanpur Toll Plaza on the Delhi-Jaipur section of NH-48. The information was shared through an official PIB release.

Before this, NHAI had introduced the technology at Daulatpura and Manoharpura toll plazas along the same corridor.

The MLFF system combines FASTag-based electronic toll collection with Automatic Number Plate Recognition (ANPR) technology. It allows vehicles to pass through toll locations without stopping at physical barriers.

The initiative aims to cut waiting time, reduce fuel consumption and ease congestion at toll plazas. It is also intended to make highway journeys more convenient.

Developer Selection Is the Next Key Step

The next major development for motorists travelling between Manoharpur and Dausa will be the selection of the private developer.

Confirmation of the construction schedule will follow the developer selection process for the 62.235-km highway upgrade.
 

Follow Infra Junction for the latest infrastructure news and construction equipment updates. Compare new and used JCB, excavator, loader, crane, and compactor specifications and check prices, all on one platform.

Previous

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.