Get Loan

New Jammu-Srinagar Highway to Cut Travel Time to 3–3.15 Hours

CalenderPublished at September 24, 2026
New Jammu-Srinagar Highway to Cut Travel Time to 3–3.15 Hours

200-km Corridor to Link Katra, Reasi and Kulgam

A new highway linking Jammu and Srinagar is expected to cut travel time between the two cities to 3–3.15 hours. The proposed route will be the third alternate surface link after NH-44 and Mughal Road. It will reduce the journey distance by nearly 50 km compared with the existing NH-44 route via Ramban.

Route to Run Through Katra, Reasi and Kulgam 

The proposed highway will form a new surface connection between Jammu and Srinagar through Katra-Reasi-Mahore-Gulabgarh-Nandimarg and Kulgam. The corridor is also planned as an extension of the Delhi-Amritsar-Jammu-Katra Expressway.

At present, the Jammu-Srinagar distance through Mughal Road is 330 km. The main NH-44 route through Udhampur, Ramban and Banihal covers about 245 km. The proposed corridor will cover 195–197 km, bringing the total distance below 200 km.

₹20,000-Crore Budget Proposed

Highly placed official sources told the ‘Excelsior’ that the Union Ministry of Road Transport and Highways (MORTH) will shortly give this highway to the people of Jammu and Kashmir.

💡 Do You Know?

Banihal Cart Road (BC Road) was one of the first major motorable routes connecting Jammu with the Kashmir Valley. Opened in 1922, it is over 100 years old.

The Union Government has identified the project as a priority highway from a defence perspective. It will provide a vital link to border and LoC districts, including Rajouri and Poonch. The connectivity will extend through Pouni, Sunderbani, Kalakote and Budhal.

DPR Tender Process Cleared

Sources said MORTH has given the National Highways Authority of India (NHAI) the green signal to begin the DPR tender process. Bidding for feasibility studies, traffic surveys and alignment engineering designs took place during the last week of June. 

NHAI experts have already completed the preliminary survey. Like NH-44, the proposed route will operate as an all-weather highway. It is also expected to reduce traffic pressure on the existing NH-44.

The project carries an estimated cost of Rs 20,000 crores. Sources said the highway is expected to become operational within the next 5–7 years.

Long Tunnel in Pir Panjal

NHAI Regional Officer, J&K, R S Yadav said several tunnels are planned between Katra, Reasi and Mahore. The longest tunnel, measuring nearly 7–8 km, will cross the Pir Panjal Ranges between Gulabgarh, Nandimarg and Kulgam.

Several major bridges have also been proposed along the corridor. These structures will shorten the route between Reasi-Arnas and the Dharmari-Sar Bagga-Gulabgarh section.

Mr Yadav said nearly 50 km of the roughly 200-km highway will pass through tunnels and bridges.

Four-Lane Route to Rejoin NH-44

The proposed corridor will be a four-lane highway from Katra through Reasi, Gulabgarh and Kulgam. It will bypass sections of the heavily congested NH-44. The new alignment between Katra and Kulgam will then reconnect with NH-44 near Kulgam on the route to Srinagar.

Mr Yadav described it as the fastest second all-weather highway connecting Kashmir with the rest of the country.

Boost for Katra and Reasi Economy

Mr Yadav said the highway will extend the Delhi-Amritsar-Katra Expressway and benefit several areas across the region. He said people in Katra, Reasi, Mahore, Gool-Gulabgarh and Budhal will benefit significantly from the new connectivity.

The project is also expected to boost economic activity across Katra, Reasi, Mahore and Gulabgarh.

Tourism Potential in Mahore-Gulabgarh

National Conference MLA from Gulabgarh (Mahore), Engineer Khursheed Ahmed, called the proposed highway a game changer for Mahore and Gulabgarh. He said the area has significant tourism potential and the highway will boost tourism and the local economy.

Khursheed said people from Gulabgarh, Mahore, Dharmari, Arnas, Sugari and Chassana currently use Daggan Pass and the Gool-Ramban road to reach Srinagar. Daggan Top remains closed during winter because of snowfall, while Mughal Road also stays closed for long periods during the winter.

As a result, residents first travel to Jammu before reaching Srinagar through Udhampur and Ramban. Khursheed said this route consumes considerable time and money.

He said residents from Mahore will be able to reach Srinagar in less than two hours once the highway becomes operational.

Traffic Expected From Rajouri and Ramban

Khursheed said the highway would be a major connectivity boost for the remote areas of Reasi district. He added that more than 60% of traffic could use the highway in the future because it will provide the shortest Jammu-Srinagar route.

People from Budhal, Kotranka and Khawas in Rajouri are also expected to use the corridor to reach Kashmir. Residents of Gool subdivision in Ramban district are also expected to use the new highway for connectivity with Kashmir.

Follow Infra Junction for the latest infrastructure news and construction equipment updates. Compare new and used JCB, excavator, loader, crane, and compactor specifications and check prices, all on one platform.

Previous

Next

Popular Construction Equipments

CAT 120 Motor Grader
CAT 120

Blade Base40°

₹ 1.37 - 1.40 Cr
CAT 424 Backhoe Loader
CAT 424

Engine Power75 HP

₹ 34 - 35 Lakh
JCB 3DX Backhoe Loader
JCB 3DX

Engine Power37 kW (49hp) @ 2 050 rpm

₹ 35 - 38 Lakh
JCB AgriMax Wheeled Loader
JCB AgriMax

Motor Power49 Hp

₹ 17 Lakh
View All Motor GradersView All Motor Gradersicon

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

ACE AX-124 Backhoe Loader
ACE AX-124 Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 23 - 31 Lakh
ACE AX-124 NS Backhoe Loader
ACE AX-124 NS Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 31 - 33 Lakh
ACE AX-124 4WD Backhoe Loader
ACE AX-124 4WD Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 27 - 29 Lakh
ACE AX-130 Backhoe Loader
ACE AX-130 Backhoe Loader
Engine Power
Engine Power
76 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 17 - 24 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.