Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Nagpur to Get 1.43-km Flyover to Link Manewada & Mhalgi Nagar

CalenderPublished at February 11, 2025 by InfraJunction
Nagpur to Get 1.43-km Flyover to Link Manewada & Mhalgi Nagar

How This Flyover Will Ease Traffic in South Nagpur

The Public Works Department (PWD) has sanctioned the construction of a third flyover on the Inner Ring Road, worth ₹185 crore. This new stretch will bridge the gap between the under-construction flyovers at Manewada and Mhalgi Nagar Squares, creating a single 2.80-km long elevated corridor. Once completed, the project aims to reduce congestion and improve traffic flow in South Nagpur.

Key Highlights of the New Flyover Project

Project Scope and Investment

  • The third flyover will be 1.43 km long.
  • Total project cost: ₹185 crore.
  • Once completed, the combined flyover will stretch 2.80 km.

Construction Progress and Challenges

  • Manewada and Mhalgi Nagar flyovers are under construction at ₹73.14 crore each.
  • The original design has been modified to integrate the third flyover.
  • Work has begun at Mhalgi Nagar, with two piles completed and the third in progress.
  • Final clearance for the Manewada flyover is awaited before construction starts.

Traffic and Safety Benefits

  • The flyover will ease congestion on the Inner Ring Road, a major route for heavy vehicles.
  • It will reduce accidents by diverting traffic above ground.
  • The total width of the flyover will be 17 meters, ensuring smoother vehicle movement.

Statements from Key Officials

Krusha Gharde, executive engineer of the PWD’s World Bank division, confirmed the approval and upcoming construction steps. "We have received approval for ₹185 crore for the third flyover. The previous tender was cancelled, and a new one will be issued next week."
A local commuter shared concerns over current road conditions, stating, “One side of the road has been dug up, and barricades on the other side have narrowed the road, causing heavy traffic jams.”

Future Prospects

Once completed, this integrated flyover system will transform connectivity in South Nagpur. The project will facilitate smoother travel between Manewada and Mhalgi Nagar Squares while enhancing road safety. Commuters can expect significant improvements in traffic flow, making daily travel more efficient.
Construction is progressing steadily, and with the new approvals in place, authorities aim to complete the project at the earliest.
 

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Popular Models By Category





View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

Similar Backhoe Loaders

JCB 2DX Backhoe Loader
JCB 2DX Backhoe Loader
Engine Power
Engine Power
36.4 kW (49 hp)
Bucket capacity
Bucket capacity
0.18 Cum
Digging Depth
Digging Depth
3020 mm
icon
Ex-Showroom price
₹ 18 - 20 Lakh
ACE AX-124 Backhoe Loader
ACE AX-124 Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 23 - 31 Lakh
ACE AX-124 4WD Backhoe Loader
ACE AX-124 4WD Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 27 - 29 Lakh
ACE AX-124 NS Backhoe Loader
ACE AX-124 NS Backhoe Loader
Engine Power
Engine Power
74 HP
Bucket capacity
Bucket capacity
0.24 Cum
Digging Depth
Digging Depth
4250 mm
icon
Ex-Showroom price
₹ 31 - 33 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Nagpur to Get 1.43-km Flyover to Link Manewada & Mhalgi Nagar