Get Loan

Mumbai-Pune Greenfield Expressway to Cut Travel Time to 90 Minutes

CalenderPublished at November 24, 2026
Mumbai-Pune Greenfield Expressway to Cut Travel Time to 90 Minutes

₹15,000 Crore Project Gets New Tender Date

The tender-opening date for the proposed Mumbai-Pune Greenfield Expressway has been pushed to November 27, 2026. The 130-km, eight-lane project carries an estimated cost of ₹15,000 crore. Once operational, it aims to reduce travel time between Mumbai and Pune to just 90 minutes.

Several infrastructure projects across India are expected to reduce long-distance travel time. While many have already opened to motorists, the proposed Mumbai-Pune Greenfield Expressway is among the upcoming projects.

According to The Free Press Journal, the new highway will run parallel to the existing Mumbai-Pune Expressway. It is planned as an alternative route to accommodate rising intercity traffic.

New Route to Handle 3 Lakh Vehicles Daily

The proposed expressway is expected to carry nearly three lakh vehicles every day. It also aims to reduce traffic pressure on the existing Mumbai-Pune corridor.

The National Highways Authority of India (NHAI) has requested a detailed report to assess the project's requirements. The extended tender-opening date is expected to help determine the next steps towards implementation.

Expressway Construction Planned in Two Phases

The Mumbai-Pune Greenfield Expressway will be developed in two phases. According to Lokmat Times, the first phase will cover approximately 30 km between Pagote and Chowk.

This section is expected to cost around ₹4,500 crore.

Second Phase to Cover 100 Km

The second phase will cover the remaining 100 km of the proposed expressway. Preparatory activities are underway for this section, including the preparation of a Detailed Project Report (DPR) and other assessments.

The project is expected to benefit motorists travelling between Mumbai and Pune. It will also serve people travelling towards Bengaluru.

Better Connectivity for Motorists 

Together, both phases are planned to provide an additional high-speed road connection between Mumbai and Pune. This will give motorists another route besides the existing expressway.

Once completed, the new corridor could reduce traffic pressure on the current Mumbai-Pune Expressway. It is also expected to improve connectivity between cities across Maharashtra. However, achieving the projected 90-minute journey time will depend on project completion and operational arrangements.

Follow Infra Junction for the latest infrastructure news and construction equipment updates. Compare new and used JCB, excavator, loader, crane, and compactor specifications and check prices, all on one platform.

Previous

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.