
The Karnataka Cabinet has sanctioned ₹2,321 crore to upgrade 130.85 km of roads across Bengaluru through white-topping. The fourth phase will cover 88 roads, with the work organised into 12 packages for execution.
The programme aims to address repeated road damage and increase the lifespan of important city routes. It will also cover scientifically designed walkable footpaths, redesigned junctions, street furniture and improved street lighting.
Greater Bengaluru Development Minister Krishna Byre Gowda said these upgrades would help create durable, pothole-free roads. He added that the project would improve motorability across Bengaluru.
The integrated improvements are also intended to make pedestrian movement safer and more convenient. Footpaths and other streetscape facilities will form part of the road development work.
The recently asphalted section of Bannerghatta Road has also been included in the fourth phase. The 10-km stretch will receive ₹222 crore for white-topping.
This allocation forms part of the larger road improvement programme approved by the Cabinet.
The civic body has finished the first and second phases of the white-topping programme. Meanwhile, work under the third phase is progressing at different stages.
The latest Cabinet approval brings more roads under the programme. It also establishes 12 separate packages for carrying out the approved work.
Implementation will take place in stages across different parts of Bengaluru. The entire project will not be handled through a single citywide contract.
White-topping involves laying a concrete layer over an existing road surface. The Karnataka government is using this method as a longer-lasting option for selected roads.
The approved phase goes beyond replacing road surfaces. It combines concrete road work with junction redesign, pedestrian facilities, street lighting and street furniture improvements.
These additions are aimed at improving the usability and appearance of the selected road corridors.
Previous
Connect With Us
4th Floor, Tower 23, A23, Block A, Sector 9, Noida, Uttar Pradesh 201301
© 2026 InfraJunction. All Rights Reserved.