Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

UP Government Pushes for Timely Ganga Expressway Completion

CalenderPublished at April 28, 2025 by InfraJunction
UP Government Pushes for Timely Ganga Expressway Completion

Uttar Pradesh Chief Minister Yogi Adityanath recently visited the under-construction Ganga Expressway. He checked the progress closely and told officials to complete the work on time without compromising on quality.

CM Inspects Progress Across Key Districts

During his visit, Yogi Adityanath inspected different sections of the expressway, including Hardoi, Shahjahanpur, and Hapur. He interacted with workers and engineers on site and carefully reviewed the construction work. In addition, he made it clear that both speed and quality must go hand in hand.

Use of Advanced German Technology

One of the main highlights of this expressway is the use of new German technology. Perhaps for the first time in Uttar Pradesh, this technology is being used to build better roads. Yogi Adityanath stated that “this step will enhance the strength and comfort of the expressway, making travel much smoother for everyone.

Ganga Expressway to Boost Trade and Tourism

In Shahjahanpur, the Chief Minister also did an aerial survey to check the progress of the airstrip construction. This airstrip will be an important feature of the expressway. Moreover, once completed, the Ganga Expressway will connect western and eastern Uttar Pradesh, helping to grow trade, tourism, and the economy. This project also supports the Government of India's PM Gati Shakti plan, aiming to boost the country's infrastructure.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Top News

Popular Models By Category





View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
Price Coming Soon
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • UP Government Pushes for Timely Ganga Expressway Completion