Get Loan

Bihar Railways Gets Record Rs 10,000 Crore Allocation for FY27

CalenderPublished at June 21, 2026
Bihar Railways Gets Record Rs 10,000 Crore Allocation for FY27

Aims at Infrastructure Expansion & Bullet Train Connectivity

Bihar will receive more than Rs 10,000 crore for railway infrastructure development in FY2026-27. Railway Minister Ashwini Vaishnaw announced the record allocation during his visit to the state on Friday.
Mr Vaishnaw made the announcement during a programme in Saran. There, he flagged off the Chapra–Delhi (Anand Vihar) Express, Mau–Delhi (Anand Vihar) Express and the extended Doohri Ghat–Aunrihar MEMU service to Varanasi.

Three Train Services Launched in Saran

Two newly launched express trains will connect Chapra and Mau with Delhi's Anand Vihar. Additionally, the Doohri Ghat–Aunrihar MEMU train service has been extended to Varanasi. 

Bihar Chief Minister Samrat Choudhary attended the programme, while Uttar Pradesh minister AK Sharma joined virtually.

Five New Platforms Planned at Patna Junction

Addressing the gathering, Mr Vaishnaw said five additional platforms are being built at Patna railway junction to increase passenger handling capacity.

He also said development work is underway at Fatuha railway station near Patna.

The minister highlighted the expansion of Bihar's railway network over the past 12 years. He said 2,034 km of new tracks were laid under Prime Minister Narendra Modi's leadership. 

Bullet Train to Cut Delhi–Patna Travel Time to 4 Hours 41 Minutes

Mr Vaishnaw said high-speed rail connectivity linking Delhi, Lucknow, Varanasi, Patna and Siliguri is expected to become operational in the coming years.

“Bullet train connectivity from Delhi to Lucknow, Lucknow to Varanasi, Varanasi to Patna and Patna to Siliguri will begin in the coming years. The journey time from Delhi to Patna will be reduced to just 4 hours and 41 minutes once the bullet train becomes operational,” he informed.

Centre Plans 200 Additional Trains for Bihar

The minister also said the Centre is preparing to introduce 200 new trains in Bihar over the next seven to eight years.

Previous

Next

Popular Construction Equipments

JCB 2DX Backhoe Loader
JCB 2DX

Engine Power36.4 kW (49 hp)

₹ 18 - 20 Lakh
JCB 3DX Backhoe Loader
JCB 3DX

Engine Power37 kW (49hp) @ 2 050 rpm

₹ 35 - 38 Lakh
CAT 424 Backhoe Loader
CAT 424

Engine Power75 HP

₹ 34 - 35 Lakh
Tata Hitachi Shinrai Power 4 Backhoe Loader
Tata Hitachi Shinrai Power 4

Engine Power99 HP

Price Coming Soon
View All Backhoe LoadersView All Backhoe Loadersicon

Top News

Popular Models By Category

‌
‌
‌
‌
View All Backhoe LoadersView All Backhoe Loadersicon

Check On Road Price

User Icon
phone
location icon

Similar Backhoe Loaders

Tata Hitachi Shinrai Pro Backhoe Loader
Tata Hitachi Shinrai Pro Backhoe Loader
Engine Power
Engine Power
55 HP
Bucket capacity
Bucket capacity
0.09 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
Price Coming Soon
Tata Hitachi Shinrai Power Backhoe Loader
Tata Hitachi Shinrai Power Backhoe Loader
Engine Power
Engine Power
99 HP (73.4 kW) @ 2,200 RPM
Bucket capacity
Bucket capacity
0.3 Cum
Digging Depth
Digging Depth
5003 mm
icon
Ex-Showroom price
₹ 23 - 27.45 Lakh
JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
37 kW (49hp) @ 2 050 rpm
Bucket capacity
Bucket capacity
0.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
Tata Hitachi Shinrai Prime Backhoe Loader
Tata Hitachi Shinrai Prime Backhoe Loader
Engine Power
Engine Power
74.3 HP
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4700 mm
icon
Ex-Showroom price
₹ 33 - 35 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
Bike JunctionTractor JunctionTruck JunctionItotyCarjunctionTractor Guru

Connect With Us

© 2026 InfraJunction. All Rights Reserved.