percentage_iconCheck Latest Offers
Cross
whatsappicon

Infra Equipment’s ki Dunia ki har news, Sirf Infra Junction Whatsapp Par

Join Now

Trial Run Begins on Bandikui–Jaipur Link Expressway

CalenderPublished at July 4, 2025 by InfraJunction
Trial Run Begins on Bandikui–Jaipur Link Expressway

A Major Boost to Regional Road Connectivity

The National Highways Authority of India (NHAI) has initiated the trial run of the newly built Bandikui–Jaipur Link Expressway, a key connector to the Delhi-Mumbai Expressway. The 66.91-kilometre, four-lane access-controlled stretch was opened for public trial on Wednesday, offering a toll-free travel experience for ten days.

Constructed ahead of schedule at a cost of ₹1,368 crore, this expressway is expected to reduce travel time between Jaipur and Delhi from the current 5–6 hours to just 2.5–3 hours.

Key Highlights of the Bandikui–Jaipur Expressway

  • Expressway Length: 66.91 km
  • Total Cost: ₹1,368 crore
  • Speed Limit: Up to 120 km/h
  • Trial Run: 10 days, toll-free (except for restricted vehicles)
  • Jaipur–Delhi Travel Time: Expected to reduce to 2.5–3 hours
  • Bandikui–Jaipur Commute: Down to 25–30 minutes from one hour
  • Connectivity: Links Delhi-Mumbai Expressway and Manoharpur-Kauthun Highway
  • Khuri Interchange: Now operational for traffic flow

Seamless Travel Experience During Trial

The trial run, which began at 8 AM, allows all vehicle categories—except motorcycles, tractors, and other restricted types—to use the road toll-free. This phase is aimed at conducting infrastructure checks, system testing, and quality assessments.

According to B.S. Joiya, Project Director of NHAI’s Dausa Unit, “All preparations for toll collection are complete. As soon as we receive the green signal from higher authorities, toll operations will commence.”

Future Toll Rates (Proposed)

As per IANS reports, the expected toll charges are:

  • ₹150 for Jaipur–Bandikui stretch
  • ₹550–₹560 for Jaipur–Bandikui–Sohna stretch
  • ₹130 for Sohna–Gurugram six-lane road
  • ₹680–₹690 for full Jaipur–Delhi commute

Strengthening Highway Infrastructure

The newly operational Khuri Interchange will regulate traffic from the Manoharpur-Kauthun highway. Additional interchanges are set to be opened shortly to further streamline regional travel.

This expressway is part of a larger effort by NHAI to build high-speed corridors that improve connectivity, reduce congestion, and support economic activity in northern India.

Statement from Officials

A senior NHAI official stated, “This project is not just about cutting down travel time. It’s a key enabler for economic and social integration in the region. The access-controlled design ensures both safety and speed, making it a future-ready corridor.”

Looking Ahead

The successful implementation of the trial phase will help identify and address any operational gaps before toll collection officially begins. Once fully functional, the Bandikui–Jaipur Expressway will significantly ease travel for commuters and freight operators alike, strengthening the link between Rajasthan and the national capital region.

As India advances its expressway network, such developments stand as testimony to the country’s commitment towards faster, safer, and more efficient transportation.

Follow us for the Latest Infra Industry Updates

Facebook -  https://www.facebook.com/infrajunction/ 
Instagram - https://www.instagram.com/infra_junction/

share imgshare img

Previous

Next

Popular Construction Equipments

JCB 3DX Backhoe Loader
JCB 3DX

Engine Power36 kW (49 hp) @ 2000 RPM

₹ 35 - 38 Lakh
JCB 3DX Plus Backhoe Loader
JCB 3DX Plus

Engine Power55kW (74hp) @ 2200 rpm

₹ 30 - 32 Lakh
JCB 2DX Backhoe Loader
JCB 2DX

Engine Power36.4 kW (49 hp)

₹ 18 - 20 Lakh
JCB 4DX Backhoe Loader
JCB 4DX

Engine Power55kW (74hp) @ 2200 rpm

₹ 36 - 40 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon

Top News

Check On Road Price

Similar Backhoe Loaders

JCB 3DX Backhoe Loader
JCB 3DX Backhoe Loader
Engine Power
Engine Power
36 kW (49 hp) @ 2000 RPM
Bucket capacity
Bucket capacity
1.26 Cum
Digging Depth
Digging Depth
4770 mm
icon
Ex-Showroom price
₹ 35 - 38 Lakh
JCB 4DX Backhoe Loader
JCB 4DX Backhoe Loader
Engine Power
Engine Power
55kW (74hp) @ 2200 rpm
Bucket capacity
Bucket capacity
0.32 Cum
Digging Depth
Digging Depth
5360 mm
icon
Ex-Showroom price
₹ 36 - 40 Lakh
Mahindra Earthmaster VX Backhoe Loader
Mahindra Earthmaster VX Backhoe Loader
Engine Power
Engine Power
79.89 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Digging Depth
Digging Depth
4959 mm
icon
Ex-Showroom price
₹ 23 - 25 Lakh
Mahindra SX Smart 50 Backhoe Loader
Mahindra SX Smart 50 Backhoe Loader
Engine Power
Engine Power
49.2 Hp
Bucket capacity
Bucket capacity
0.27 Cum
Hydraulic oil
Hydraulic oil
100 Ltr
icon
Ex-Showroom price
₹ 30 - 31 Lakh
View All Backhoe LoadersView All Backhoe Loadersicon
  • Home
  • News
  • Trial Run Begins on Bandikui–Jaipur Link Expressway